Orders, activation, QA
Provisioning &
Provisioning &
Service Activation
High-volume, zero-outage activation for Tier 1 operations.
Mikkena Global provides provisioning excellence for Tier 1 operators, ensuring every service order is engineered, validated and activated with precision across fiber, coax and enterprise infrastructures.
What we do
- Design and assignment validation: end-to-end verification of circuit design, logical paths, ONT/CPE assignments, IP schema, VLANs, routing intent and templates.
- Activation and configuration: service turn-ups across voice, data, static IP, transport, enterprise internet, SASE, Layer 2 and Layer 3 services following operator standards.
- Real-time service and RFC testing: standards-based performance testing (e.g. RFC 2544, ITU-T Y.1564) for throughput, latency, jitter and loss, combined with ping and route analysis, QoS enforcement, CMTS/OLT mapping, CPE authentication, MAC alignment, light-level verification and full service-readiness checks.
- Cross-system synchronisation: keeping engineering tools, OSS/BSS, workflow systems and support channels in sync for clean activations.
- Quality assurance and exception handling: resolving configuration mismatches, design inconsistencies, porting errors, device provisioning issues and address conflicts.
Why Tier 1 operators choose Mikkena:
Teams trained in American and European telecom standards, scalable capacity for order surges, dedicated QA and RFO prevention methodologies, and a proven zero-impact track record.
| Performance (2024–2025) | ||
|---|---|---|
| 2024: | 38,279 orders provisioned, | 0 outages originating from provisioning |
| 2025: | 29,094 | 0 outages originating from provisioning |
| YTD: | orders provisioned | 0 outages originating from provisioning. |
| Ultra-high accuracy with approximately 99.99% configuration success. | ||
Prefer to reach
out directly?
Plan the next wave
Schedule time with Mikkena engineering leadership to map out your telecom or data center roadmap.
Book a working sessionResources & playbooks
- Zero-outage migration methodology
- EVPN spine-leaf reference guide
- 24/7 ENOC operations checklist
Stay Updated
Get quarterly insights on telecom, DC and automation programs.